Bathroom remodels — from primary suites to guest baths.
Full bath renovations: tile showers, vanities, plumbing updates, lighting, and finish work.
Bathrooms that hold up to daily use.
Bathrooms take more punishment than any other room in the house — water, humidity, temperature swings, daily use. A remodel that looks great for six months and then leaks is not a remodel; it's a preview of a bigger repair. We build bathrooms with proper waterproofing (Schluter, RedGard, or membrane pans depending on the job), ventilation sized to the room, and plumbing rough-ins that pass inspection the first time. Tile is set on the right substrate with the right thinset and grouted with materials that don't need to be re-done in three years. Whether it's a $15,000 guest bath refresh or a $60,000 primary suite build-out, we walk the scope with you before demo, hold the schedule in writing, and communicate every day. Licensed Arizona contractor ROC #366257.
- Tile showers and tub surrounds
- Custom and semi-custom vanities
- Quartz, granite, and marble tops
- Plumbing relocation and updates
- Heated floors and lighting design
- Full finish carpentry and paint

Common questions
How long does a bathroom remodel take?
A guest bath refresh (vanity, tile, fixtures) runs 2–4 weeks. A primary bath with a new shower, plumbing changes, or wall moves runs 6–10 weeks.
Do you build custom tile showers?
Yes — that's most of what we build. Curbed or curbless, single or double shower head, bench seats, niches, linear drains. We waterproof properly so the shower lasts.
Can you make a small bath feel bigger without moving walls?
Often yes — wall-hung vanities, larger mirrors, better lighting, glass shower doors instead of curtains, and lighter tile all help. If it needs a real footprint change, we'll tell you what that costs before you commit.